ESTIMATING AND BUDGETING A MEDIUM SCALE BUILDING PROJECT
ESTIMATING AND BUDGETING A MEDIUM SCALE BUILDING PROJECT (A CASE STUDY OF A PROPOSED DEPARTMENT OF QUANTITY SURVEYING AT KWARA STATE)
This
project is based on proposed multi-purpose studio hall off Oke Ose community
central mosques Ilorin.
Kwara
state is one of the 36 states in Nigeria, in which Ilorin is the Capital; in
Kwara state we have several higher institutions which include university of
Ilorin, Kwara State Polytechnic, Federal Polytechnic Offa, College of Education
Oro, Kwara State University Ilorin and also College of Education Ilorin.
TELEVISION STUDIO
A
television studio is an installation in which video production take place,
either for the recording of live television to video tape, or for the
acquisition of raw footage for post production.
STUDIO FLOOR
A studio floor is the actual stage on
which the actions that will be recorded take place. Studio floor has the
following characteristics and installations:-
-
Decoration or sets
-
Professional video camera (sometimes
one usually several) on pedestals.
-
Microphones
-
Stage lightning rigs and the
associated controlling equipment.
-
Several video monitors for visual
feedback from the production control room (PCR).
-
A small public address system for
communication
-
A glass window between PCR and studio
floor for direct visual contract is usually desired, but not always possible
while a production is in progress, people composing a television crew work
studio floor.
PRODUCTION CONTROL ROOM
The studio control room (SCR) is the
place in a television studio in which the compositions of the outgoing program
take place. The production control room is occasionally also called a studio
room.
MASTER CONTROL ROOM
The mater control room, house equipment
that is too noisy or runs too hot for the production control room (PCR). It
also makes sure that coax cable and other wire lengths and installation
requirement keep within manageable lengths since most high-quality wiring runs
only between devices in this room.
OTHER FACILITIES
A television studio usually has other
rooms with no technical requirement beyond broadcast reference monitors and
studio monitors for audio. Among them are:-
-
One or more make-up and changing
rooms.
-
A reception area for crew, toilet and
visitors, commonly called the green room.
The
design term on consultancy, services headed by the Architects, civil engineers,
who carry out the design, this process are a planned office works into the
requirement of the client. The production of a building in a more economical,
quick and orderly manner, other professional function along side with the
architect for the cost implication and preparation of bill of quantities (BOQ).
The expected professional needed at the stage is the quantity surveyor. His
concern is the economics of all resources such as labor, plant materials and
financial aspect in order to produce building in the quick and economical
manner because many building today have not been completed.
1.1 DESCRIPTION OF WORKS
These
projects consist of construction and erection of the proposed Multi-Purpose
studio Hall situated at Oke-Ose community at University of Ilorin teaching
hospital Ilorin Kwara State, Nigeria.
The studio development and take off
project will be constructed on loamy soil of about 28,410 in length and 13,820
widths.
The construction is formed on plain over
site concrete floor is of reinforce concrete slab (150mm thick). The walls are
230mm tick concrete block. The roofing used in long san aluminum roofing sheet
fixed a roofing structure, plumbing installation, electrical installation
complete etc.
1.2 AIM AND OBJECTIVES
The
major aim of the study is to estimate and budget for proposed Multi studio hall
at Oke Ose community, Ilorin.
OBJECTIVES
-
To understand bill operation of taking
off process, abstraction bill drafting and pricing.
-
To understand the process of site
feasibility report.
-
To understand the process of given
pre-construction cost of any proposed project.
1.3 SCOPE OF THE PROJECT
The scope of the project is to prepare a
draft bill of quantities for a proposed multipurpose studio hall.
However, the limitation may not be
accurate as a result of:
-
Inability of conduct proper site
investigation.
-
Inability of conduct the architect
that designs the project
EDITOR SOURCE: Estimating And Budgeting A Medium Scale Building Project